Direkt zum Hauptinhalt
Mars: In-line arrayed X-ray system >
Platform
Branchen
Alle Branchen
Aerospace and Defense
Agriculture and Food
Athletic Equipment
Automotive
Batteries
Consumer Packaged Goods
Electronics
Medical Devices
Applications
Ressourcen
Whitepapers
Ressourcen
Webinare
Blog
Insights from lumafield
Go/No-Go
Manufacturing podcast
First Article
Editorial Publication
Firma
Über
Karriere
Drücken
Events
Starten Sie Voyager
Vertrieb kontaktieren
Speisekarte
ProdukteBranchen
Branchen
Alle Branchen
Medical Devices
Electronics
Consumer Packaged Goods
Automotive
Athletic Equipment
Batteries
Agriculture and Food
Aerospace and Defense
Applications
Ressourcen
Ressourcen
Whitepapers
101. OKTOBER
Webinars
Erster Artikel
Go/No-Go Podcast
First Article
Firma
Firma
Über
Karriere
Drücken
Events
Vertrieb kontaktieren
Starten Sie Voyager
© 2000 Lumafield. All Rights Reserved.

Case Study:
Enabling 85% Faster Time-to-Decision

A globally recognized CPG conglomerate condensed time-to-decision from three weeks to three days.

Summary
  • A globally recognized CPG conglomerate reduced their time-to-decision for packaging defects from three weeks to just three days with Lumafield’s industrial X-ray CT technology.    
  • When a deodorant cap failed a pull test and put one of their brands at risk, engineers identified and resolved the issue 85% faster with the help of their Neptune scanner.
  • With Neptune in-house and Voyager operating in a web browser, the company has streamlined their R&D, testing, and product development processes without the need for long wait times due to outsourcing.
Background

Our customer is a British multinational manufacturer of well-known personal care, nutrition, hygiene, and ice cream products, including many brands that have become household names across the globe. The company owns over 400 brands worldwide, and has a deep commitment to making sustainable living accessible to the 3.5+ billion people who use their products every day. Product packaging plays a critical role in both the company’s sustainability initiatives and the quality of the experience that each of their customers has when using one of their portfolio products.

Packaging for these products is often intricate and complex – especially packaging for beauty products like deodorant and shampoo, which often include a variety of small, codependent parts. If a packaging issue arises, CPG manufacturers often find themselves thrust into an inefficient R&D process which leaves them waiting weeks for outsourced parts and CT scans. Any increase in the time-to-decision regarding changes to defective packaging means more opportunity for bad products to enter the field and find their way into the hands of customers.

CT scans show an intricate snap-fit engagement between a cosmetics pump casing and bottle. The threading where the pump screws into the reservoir is misaligned, and there’s a gap that causes the pump to not dispense the serum properly.
Accelerating the Time-to-Decision Process

A recent lightweighting modification led to the cap from one of our customer’s deodorant products failing a pull test. The company’s engineers struggled to make sense of the issue and knew that they could not afford to wait three weeks for the outsourced CT scanning process to run its course. With hundreds of thousands of units of this deodorant in production and soon to be in the hands of consumers in over 150 countries, they needed to diagnose and fix the issue in a matter of days – not weeks. “Issues like this defective deodorant cap can cost us millions of dollars and quickly erode the trust we’ve built with consumers over decades of providing them with top quality products,” said our customer’s VP of Product Development.

With Lumafield’s Neptune CT scanning technology now available in-house, they were able to immediately analyze scanned cross-section imagery of the product and understand why the cap was not properly engaging with the rest of the packaging. These scans gave the customer’s engineering team the evidence they needed to understand why the product had failed the pull test and what needed to be done to make the proper design change. In this situation, Neptune reduced the engineering team’s time-to-decision from three weeks to just three days – an 85% improvement in efficiency that prevented the company from sending hundreds of thousands of potentially defective products to consumers worldwide.

Lumafield’s technology has opened the door for us to immediately address issues and prevent bad products from ever hitting shelves. Neptune has already paid for itself many times over!

          —VP of Product Development

Download a PDF of this Customer Story

More Customer Stories

Customer Story: RFK Racing

Customer Story: iFixit

Customer Story: Axon

Customer Story: WHOOP

Customer Story: Saucony

Customer Story: Intrepid Automation

Customer Story: rms Company

Customer Story: L’Oréal

Customer Story: Trek Bicycle

Customer Story: Desktop Metal

Customer Story: Informal

Customer Story: Eaton

Customer Story: Alloy Enterprises

Case Study:
Transforming Product Education with Industrial CT

Case Study:
The Versatility of In-House CT Scanning

Case Study:
Replacing Legacy CT Scanners with Neptune

Case Study:
Meeting the Evolving Needs of the World’s Top Brands

Case Study:
Maintaining FDA Compliance with Validated CT Technology

Case Study: Maximizing Testing Quality for Life-Saving Components

Case Study:
Improving Returns Analysis Efficiency

Case Study: From Destructive Testing to Optimized DV/PV

Case Study:
350% ROI on Lithium Battery Testing

Case Study:
A More Efficient Production Parts Approval Process

den Weg ändern
die Welt macht
alles
Branchen
Aerospace and Defense
Agriculture and Food
Athletic Equipment
Automotive
Batteries
Consumer Packaged Goods
Electronics
Medical Devices
Alle Branchen
Anwendungen
Assembly Verification
Competitive Benchmarking and Analysis
Defect Detection
Design Verification and Validation
Dimensional Measurement
Failure Analysis
First Article Inspection (FAI)
Material Characterization
Non-Destructive Testing (NDT)
Quality Assurance and Control (QA & QC)
Reverse Engineering
Supplier Qualification
All Applications
Produkte
NeptunTritonVoyagerMarsAtlas
Ressourcen
LernenErster ArtikelWhitepapersEreignisseWebinareUnterstützungFallstudien101. OKTOBERBlog der Ingenieure
Firma
EinloggenÜberKarriereDrückenBlogKontakt

Melde dich für unseren Newsletter an

info@lumafield.com
DatenschutzInformationssicherheitVereinbarung über Bereitstellungsdienste
© 2000 Lumafield. All Rights Reserved.